Project Description
Garrison Energy Center
Date: 2015
Location: Dover, Delaware
Client: Matrix NAC
Project scope included 1,545 spool pieces both large and small bore including the HRSG piping which required a Code Stamp. Material of construction was carbon steel, stainless steel, chrome moly 1 ¼. 2 ¼ and P91. Dixie also supplied the Circulating Water piping with diameters up to 72” having an internal Carboline Plasite coating applied.
Stay Connected